The contract was signed in February 2018 and includes the dismantling of existing, delivery and installation of new district heating substations.
The total number of substations is 285, with capacities ranging from 100 to 1500 kWh. It is expected that substations will be installed and commissioned before the start of the new heating season.
The new substations will replace the obsolete facilities and will help the residents of the capital to achieve significant heat savings.